×

Notice

The forum is in read only mode.

Increasing Job Time

  • Kamil Gul
  • Topic Author
  • Offline
  • Junior Member
  • Junior Member
More
14 years 7 months ago #4785 by Kamil Gul
Increasing Job Time was created by Kamil Gul
Hi everyone,

Is it possible to increase maximum allowable job time which we can allocate to a single simulation.
In the default aster server maximum time is approx. 99 hours

Can anyone help me to increase that time?

Thanks in advance,

Kamil
More
14 years 7 months ago #4786 by Claus
Replied by Claus on topic Re:Increasing Job Time
In /opt/aster/etc/codeaster/asrun you should be able to change the value of interactif_tpsmax

Perhaps also in you local configuration (.astk_version), I forget.

You sure it's not set to 999 hours? Mine is with STA10.2 that comes with SaloméMECA 2010.2

Code_Aster release : STA11.4 on OpenSUSE 12.3 64 bits - EDF/Intel version
  • Kamil Gul
  • Topic Author
  • Offline
  • Junior Member
  • Junior Member
More
14 years 7 months ago #4789 by Kamil Gul
Replied by Kamil Gul on topic Re:Increasing Job Time
Thanks Claus,

It was definetly 99 hours and I've changed to 999 hours on the file and refreshed the server from configuration menu.

I think it works fine now.

Sincerely,

Kamil
Moderators: catux
Time to create page: 0.119 seconds
Powered by Kunena Forum